Effective building evaluation in Austin reduces project risk by flagging structural defects, code violations, and hidden maintenance issues before they affect budgets or schedules. We approach each evaluation as a systematic review that combines ASTM-compliant assessments with City of Austin compliance requirements.
Building evaluation in Austin includes objective reviews of sites and structures to verify condition, safety, and code compliance. These reviews draw on Property Condition Assessments, City of Austin inspections, and nondestructive evaluation methods that diagnose problems without causing damage.
How Do Property Condition Assessments (PCAs) Work In Austin Under ASTM E2018?

In Austin, we conduct Property Condition Assessments in accordance with ASTM E2018, which provides a structured approach to evaluating commercial properties for developers and investors. The process begins with a comprehensive visual assessment that examines every major system across the property.
Our field teams systematically review site conditions, structural elements, building envelope components, and all MEP systems. This includes HVAC equipment, plumbing infrastructure, electrical distribution, conveying systems such as elevators, exterior facades, roofing systems, interior finishes, and site amenities. We evaluate each system for existing conditions, code compliance issues, life-cycle positioning, operational suitability, and observable defects.
Comprehensive Documentation Review and Stakeholder Interviews
The visual walk-through represents only one component of our ASTM E2018 process. We examine available maintenance records to understand historical performance and identify recurring issues. Building plans and architectural drawings help us verify as-built conditions against the original design intent.
Our reviewers also investigate future capital improvement plans to assess upcoming expenditures and align with long-term asset strategies. We research the city building department archives to uncover any code violations, permit issues, or inspection history that may affect the property. Interviews with on-site staff, including facility managers, maintenance personnel, and building engineers, provide operational insights that visual inspections alone cannot capture.
ASTM E2018 Report Structure and Key Deliverables
Property Condition Assessment reports typically range from 15 to 30 pages and follow a standardized format under ASTM E2018. The document includes detailed descriptions of each building system, photographic documentation of observed conditions, and professional opinions regarding remaining useful life and required interventions.
Two critical tables anchor every PCA report and drive capital planning decisions. The Immediate Repairs Table identifies urgent issues requiring attention within 90 days, including life safety concerns, failing systems, and deferred maintenance items exceeding $2,000 in estimated cost. These items represent conditions that pose immediate risks or could lead to system failures if left unaddressed.
The Replacement Capital Reserve Table projects major capital expenses over the next 12 years based on the expected useful lives of building systems and components. This forward-looking analysis helps property owners and lenders understand long-term financial commitments and plan replacement schedules for major building systems such as roofs, HVAC equipment, and structural elements.
Each system evaluation includes condition assessments, recommended improvements, and cost opinions to support informed decision-making. We provide context for how current conditions affect operational performance and highlight opportunities for preventive maintenance that could extend system life and reduce future capital requirements.
What City Inspections, Codes, And Approvals Affect Building Evaluations In Austin?
The City of Austin’s Building Inspection Division conducts mandatory inspections for new construction, remodels, and trade work to ensure code compliance. These inspections directly impact building evaluations by verifying current conditions and identifying potential issues before they become costly problems.
We coordinate inspections through the Austin Build + Connect (AB+C) Portal or by phone during regular business hours, Monday through Friday, 7:00 a.m. to 3:30 p.m. After-hours and 24/7 emergency inspections are available when projects demand immediate attention.
Building Code Framework for Evaluations
Austin follows the 2024 International Building Code and the 2024 International Energy Conservation Code as its foundation. Local amendments in the Building Technical Codes address specific regional requirements and environmental considerations unique to Central Texas.
The Uniform Plumbing Code governs all plumbing installations, including natural gas systems. Commercial mechanical systems fall under the Uniform Mechanical Code, while the National Electrical Code applies to all electrical work throughout the jurisdiction.
These updated codes, which took effect on July 10, 2025, include enhanced energy efficiency standards, as outlined in the Texas energy code, and electric vehicle charging infrastructure requirements. Building evaluations must account for these current code requirements when assessing compliance and planning improvements.
Certificate of Occupancy and Project Closeout
Final inspections can lead to either a Certificate of Occupancy or a Temporary Certificate of Occupancy, depending on the project’s completion status. Both documents require prerequisite inspections and proper coordination with partner departments.
The Construction and Demolition Recycling Ordinance adds another layer to the approval process. Projects exceeding 5,000 square feet of floor area must divert at least 50% of construction debris from landfills or dispose of less than 2.5 pounds per square foot.
General contractors must submit a recycling report when requesting final building inspections. This requirement applies to both new construction and major renovations, making waste management planning an essential component of project evaluations.
| Code Category | Applicable Codes |
|---|---|
| Commercial Building Code | International Building Code |
| Residential One-and-Two-Family Dwelling Code | International Residential Code |
| Plumbing Code | Uniform Plumbing Code |
| Commercial Mechanical Code | Uniform Mechanical Code |
| Electrical Code | National Electrical Code |
| Energy Code | International Energy Conservation Code |
Inspection Scheduling and Coordination Requirements
The AB+C Portal serves as the primary tool for scheduling inspections and uploading required documentation. We maintain paper copies of City-approved plan sets on-site and ensure that proper access information reaches assigned inspectors.
Special inspections require additional documentation through field folders containing logs and forms completed by certified inspectors. Commercial projects often need multiple inspection types coordinated across different trades and systems.
One-time inspections from partner departments may delay the scheduling of the final building inspection. Environmental, fire, water utility, and health department clearances must be resolved before requesting the 112 Final Building inspection.
Which Nondestructive Tools Help Evaluate Buildings Without Disruption?

Nondestructive evaluation methods allow us to assess building conditions and identify issues without damaging the structure. We rely on these techniques to gather essential information about concrete integrity, steel components, and building envelope performance while maintaining operational continuity.
Electromagnetic and Radar Technologies: Ground-penetrating radar maps internal features such as reinforcement placement, voids, and moisture infiltration within concrete and masonry. This technology penetrates several feet into materials and creates detailed subsurface images without requiring access openings.
Acoustic Methods: Impact-echo testing uses mechanical impacts to generate stress waves and detect thickness variations, delamination, and internal flaws in concrete elements. Ultrasonic pulse velocity testing measures wave transmission through materials to evaluate density, estimate crack depth, and assess bond quality between different components.
Thermal Analysis: Infrared thermography detects temperature variations across building surfaces to identify air leakage, moisture problems, and concealed defects in the building envelope. This method is particularly effective for detecting delamination in concrete and identifying thermal bridges.
Corrosion Assessment Tools: Half-cell corrosion potential surveying evaluates the electrochemical condition of embedded steel reinforcement without exposing the bars. Resistivity testing measures concrete’s ability to conduct electrical current, indicating moisture content and potential corrosion activity.
Specialized Testing Methods: Shear-wave ultrasonic tomography creates detailed cross-sectional images of structural elements, while impulse-response testing evaluates foundation integrity and pile conditions. For steel components, we use ultrasonic inspection, eddy current testing, magnetic particle testing, and dye penetrant testing to identify surface and subsurface discontinuities.
These nondestructive techniques accelerate our diagnostic process and provide targeted data for repair recommendations. We can often complete evaluations during normal building operations, minimizing disruption while gathering comprehensive information about structural conditions and performance.
What Documentation And Coordination Streamline Evaluations And Inspections?
Successful building evaluations and inspections depend on thorough preparation and clear coordination. We organize documentation packages well before reviews begin, maintain clear communication with all stakeholders, and follow established protocols to avoid delays that can derail project schedules.
Essential Documentation for Property Condition Assessments
Property Condition Assessments require comprehensive background materials to support field observations. We assemble maintenance records from recent years, including service contracts, repair invoices, and equipment replacement schedules. These documents reveal patterns in building performance and highlight areas that require closer examination.
Approved plans and as-built drawings provide the foundation for understanding building systems and modifications. We gather architectural, structural, MEP (mechanical, electrical, and plumbing), and site improvement drawings that reflect current conditions. Capital improvement plans help reviewers understand planned investments and their impact on long-term building operations.
PCA reviewers conduct independent research beyond the provided materials. They examine city archives for permit history, zoning changes, and code compliance issues. On-site staff interviews provide insights into daily operations, recurring problems, and maintenance challenges that may not appear in formal documentation.
City Inspection Requirements and Procedures
Austin’s Building Inspection Division requires specific documentation protocols for efficient reviews. We maintain a paper copy of the latest City-approved plan set on-site throughout construction. Digital copies alone do not satisfy inspection requirements, and missing plans result in failed inspections and project delays.
The AB+C Portal serves as the primary platform for uploading required documents. We submit surveys, progress photos, and engineering reports through the portal’s attachment system. Each upload includes clear descriptions to help inspectors locate relevant information quickly.
Site access coordination prevents inspection delays and scheduling conflicts. We share gate codes, parking instructions, and emergency contact information directly with assigned inspectors. Clearly posted addresses and unit identification help inspectors locate work areas without assistance.
Pre-Inspection Preparation and Quality Control
Thorough preparation before submitting inspection requests reduces failures and reinspection fees. We verify that work is complete according to approved plans and correct identified deficiencies before scheduling. This includes checking electrical connections, plumbing fixtures, mechanical installations, and structural elements against code requirements.
Prerequisite inspections must pass before requesting a Certificate of Occupancy (CO) or Temporary Certificate of Occupancy (TCO). We track inspection sequences using the City of Austin’s commercial and residential flowcharts. Missing prerequisite approvals block final inspections and delay project closeout.
Knowledgeable project contacts remain available during inspections to answer questions and provide clarification. We designate superintendents or project managers who are familiar with construction details and code compliance issues. This coordination speeds inspections and reduces miscommunication.
Special Inspections and Partner Department Coordination
Projects that require special inspections maintain field folders with completed logs and required forms. These folders remain on-site throughout construction and include documentation from third-party inspection agencies. Missing or incomplete special inspection records result in failed building inspections.
One-time inspections from partner departments can block scheduling of final building inspections. We coordinate with Environmental Services, Austin Water, Fire Prevention, and other agencies to clear outstanding requirements. The City’s partner department contact list provides direct communication channels for resolving inspection holds.
Commercial projects often require multiple agency approvals before final occupancy. We use the City’s inspection checklists to track progress across all departments and confirm completion before requesting the 112 Final Building inspection. This systematic approach prevents last-minute delays and expedites certificate issuance.
Conclusion And Next Steps

Effective building evaluation in Austin requires coordination of ASTM E2018 property condition assessments (PCAs), City inspection requirements, and nondestructive evaluation methods. We define the scope early, prepare comprehensive records, and plan for both Immediate Repairs Table items and Replacement Capital Reserve Table requirements. This integrated approach addresses immediate life-safety concerns while establishing a long-term capital planning framework.
Schedule inspections and upload documentation through the AB+C Portal, and keep approved plan sets on-site throughout construction. Coordinate prerequisite inspections before requesting a Certificate of Occupancy or a Temporary Certificate of Occupancy. We use nondestructive evaluation findings to inform targeted repairs and system improvements. These coordinated steps reduce surprises, support code compliance, and improve overall construction outcomes for developers and property owners.
Ready to streamline your building evaluation process in Austin? Contact EB3 Construction to coordinate comprehensive property assessments and inspection management.
