Getting permits wrong can cost developers weeks of project delays and thousands in rework. Building permit assistance streamlines this process by organizing the paperwork, verifying local requirements, and ensuring completeness before submission.
We coordinate with city permitting portals to verify zoning compliance, estimate fees, and identify required permits for residential and commercial projects. This upfront work prevents the costly back-and-forth that happens when applications lack proper documentation or fail to meet local code requirements.
What Are The Core Steps To Get A Building Permit?

We structure our approach to building permits around nine essential steps that keep projects moving forward. Each phase builds on the previous one, creating a logical progression from initial concept to final approval. Our experience shows that understanding these steps upfront prevents costly delays and ensures smoother interactions with local authorities.
Defining scope and use forms the foundation of any successful permit application. We determine whether the project involves new construction, an addition, or a remodel, then classify it as residential, commercial, or industrial. The project’s size, location, and intended use directly influence which permits will be required and what documentation the jurisdiction expects.
Local research follows scope definition and proves critical to avoiding surprises. We review zoning requirements, adopted codes, and specific permit needs for each jurisdiction. Building departments often publish their regulations online, making it easier to identify requirements before submitting applications. This research phase also reveals whether special conditions or local amendments apply to the project.
Detailed construction plans represent the most technical aspect of permit preparation. Licensed architects and engineers prepare site plans, floor plans, and system schematics that meet current standards. These documents demonstrate code compliance and provide the technical detail reviewers need to assess the project thoroughly. We ensure all plans carry proper professional seals and include required specifications.
Application Assembly And Submission
Preparing a complete application packet streamlines the entire review process. Most jurisdictions require a completed permit application form, construction plans, and supporting documents such as proof of ownership, contractor licenses, and environmental reports when applicable. Incomplete submittals create immediate delays and require resubmission.
Many jurisdictions now accept online permit applications, which can speed processing and provide better tracking capabilities. We submit applications with all required fees, which vary based on project size, complexity, and location. Fee structures typically account for plan review costs, permit issuance, and inspection services throughout the construction process.
Plan review involves multiple departments checking different aspects of the project for code compliance. Building officials examine structural elements, fire departments review life safety systems, and utility departments assess water, sewer, and electrical connections. Review timelines can range from weeks to months depending on project complexity and department workloads.
Permit Issuance And Construction Oversight
When all requirements are met, the building permit is issued with specific conditions that must be followed. We carefully read all permit stipulations and post the permit at the job site as required by most jurisdictions. These conditions often include approved plan adherence, inspection scheduling requirements, and specific construction methods or materials.
Scheduling inspections throughout construction ensures ongoing compliance with approved plans and local codes. Required inspection stages typically include footing, framing, electrical rough-in, plumbing rough-in, insulation, and final inspections. We coordinate these inspections in advance to prevent construction delays and ensure each phase passes before proceeding to the next.
Final approval comes after passing the final inspection and obtaining a Certificate of Occupancy or Completion. This certificate confirms that the building complies with all applicable codes and is safe for occupancy. The final inspection covers all systems, finishes, and safety equipment to ensure everything functions as designed and approved.
Which Tools And Local Resources Can Streamline Your Submittal?
Digital tools and municipal resources can eliminate guesswork and reduce multiple rounds of corrections. We use these platforms to validate project scope and zoning compliance before formal submission.
Fort Worth’s Integrated Permit Assist Platform
The City of Fort Worth Permit Assist tool creates a single login experience that connects directly to their Accela permitting portal. Information entered during project scoping automatically populates the formal permit application.
The residential permit guide walks through common projects like additions, remodels, and accessory structures. The commercial permit guide addresses tenant improvements, new construction, and change of use scenarios. Both tools provide estimated permit costs and confirm whether the proposed use aligns with zoning requirements.
Fort Worth also maintains a public map showing current permitting activity across the city. This data autofill capability saves time during application preparation and reduces data entry errors.
Arlington’s Process Documentation
Arlington provides comprehensive process guides and instructional videos that explain zoning compliance, platting requirements, and site plan preparation. Their pre-application meeting option allows developers to discuss complex projects with city staff before formal submission.
These land development guides help clarify which departments will review specific aspects of a project. The videos demonstrate common approval pathways and highlight potential complications early in the planning process.
Electronic Compliance Verification
Some jurisdictions implement electronic compliance checks that scan submissions for common code violations or missing documentation. These systems flag issues immediately, allowing for quick corrections and resubmittals rather than waiting weeks for manual review comments.
Electronic checks typically cover basic zoning setbacks, height restrictions, and required plan elements. While they cannot replace thorough plan examination, they catch obvious errors that would otherwise delay the review process.
What Plan Review Pathways And Timelines Should You Expect?
Fort Worth provides multiple pathways to accommodate different project schedules and complexity levels. Each approach involves distinct processing times, fee structures, and coordination requirements that affect when your permit reaches approval.
Standard Plan Review Process
The standard pathway processes applications in order of receipt, requiring complete submittal packages with all supporting documentation. Plan examiners target a full set of comments within approximately seven business days, though actual timelines fluctuate based on current workload volumes. This approach works well for projects with flexible schedules where cost containment takes priority over accelerated approval.
We coordinate standard reviews by ensuring our construction documents meet all technical requirements before submission. Complete packages reduce the likelihood of multiple review cycles that extend overall processing time.
Expedited X-Team Review
The X-Team expedited review allows scheduling a collaborative meeting with plan examiners within two weeks of submittal. Design professionals attend these sessions to address comments in real time, potentially securing permit approval in a single meeting. This pathway requires an additional fee but can significantly compress review timelines for time-sensitive projects.
The expedited process works best when design teams can attend review meetings and have authority to make immediate corrections. We prepare thoroughly for these sessions, bringing backup documentation and alternative design solutions to address potential concerns efficiently.
Simultaneous Construction Plan And Plat Review
This pathway allows plan review to begin while plat recording remains in progress, though no permits issue until the final plat records at the county level. Staff must review the same permit documents twice – once with the proposed plat and again with the recorded final plat. This dual review process necessitates an additional fee to cover the extra examination cycles across multiple city divisions.
Projects choosing this route need careful timeline coordination since construction plans may require adjustments based on final plat conditions. We factor these potential revisions into project schedules and maintain flexibility in design approaches until plat recording completes.
Third-Party Plan Review Option
Certified private firms can handle building, mechanical, electrical, plumbing, and energy plan reviews under this pathway. City staff retain responsibility for zoning, fire, water, stormwater, health, and other municipal review areas. This division of responsibilities can expedite certain review components while maintaining city oversight of critical infrastructure and safety elements.
The third-party approach requires coordination between private reviewers and city departments. We manage this coordination by establishing clear communication protocols and ensuring all parties understand project requirements and timelines from the outset.
How Do Codes, Zoning, And Inspections Shape Approvals?

Building codes form the foundation of construction safety across North Texas, with cities establishing specific standards that we must meet for project approval. Fort Worth has adopted the 2021 International Code Council (ICC) codes, with the notable exception of energy requirements. The city uses the 2020 National Electrical Code (NEC) and the 2018 International Swimming Pool and Spa Code, while retaining the 2015 International Energy Conservation Code. Local amendments modify these baseline requirements to address regional conditions.
These I-Codes establish minimum safety standards for residential homes, educational facilities, and commercial buildings throughout the region. The NEC specifically governs electrical safety installations, covering everything from basic wiring to complex mechanical systems. Without compliance to these adopted standards, plan review fails and permits cannot be issued.
Why Code Compliance Drives Approval Success
Code compliance directly determines whether we receive construction approval or face project delays. The ICC codes address structural integrity, fire safety, accessibility, and life safety systems across all building types. We coordinate our construction methods with these requirements during the design phase to avoid costly revisions during plan review.
Each jurisdiction modifies base codes through local amendments that reflect climate conditions, soil characteristics, and regional construction practices. Fort Worth’s local amendments may address foundation requirements for expansive clay soils or wind load calculations for the area’s storm patterns. We review these amendments during our initial code research to ensure our plans meet all local requirements.
Zoning Districts And Development Standards
Arlington provides comprehensive resources explaining zoning districts, property zoning identification, and Unified Development Code (UDC) application. The UDC governs land use, setback requirements, building height limits, and parking ratios that affect our construction feasibility analysis. We verify zoning compliance before submitting plans to avoid fundamental project conflicts.
Zoning districts determine allowable uses for each property, affecting everything from residential density to commercial operations. Mixed-use zones may permit both residential and retail construction, while industrial zones restrict certain building types. We coordinate with zoning staff early in the process to confirm our proposed use aligns with district regulations.
Inspection Requirements And Certificate Pathways
Cities specify inspection schedules, coordination requirements, and qualified inspector credentials for each construction phase. We schedule foundation inspections before concrete placement, framing inspections before system rough-ins, and final inspections before occupancy approval. Each passed inspection closes out a portion of the permit conditions.
Passing the final inspection triggers Certificate of Occupancy issuance for residential projects or Certificate of Completion for commercial structures. These documents confirm our construction meets all adopted codes, zoning requirements, and safety standards. Without this final approval, buildings cannot be legally occupied or transferred to owners.
Conclusion and next steps

Building permit assistance becomes manageable when we break it down to core components. Start with a clear project scope that defines whether you’re pursuing new construction, additions, or renovations. Research local zoning requirements and adopted codes early to avoid costly redesigns later.
The digital tools available through city permitting portals can save significant time. We recommend using online systems to confirm zoning compliance, estimate permit fees, and submit applications electronically. Many jurisdictions now offer electronic compliance checks that identify issues before manual review begins, allowing for quick corrections and faster approvals.
Plan review pathways vary by jurisdiction and project complexity. Standard reviews typically take 7-10 business days per cycle, while expedited options can compress timelines for an additional fee. Budget for multiple review cycles and factor in inspection scheduling when setting project milestones. Remember that the final inspection triggers your Certificate of Occupancy or Completion, which legally authorizes occupancy and use.
For complex projects spanning multiple jurisdictions or tight schedules, professional permit management can streamline coordination and prevent delays. Contact EB3 Construction to discuss how our permit assistance services can support your development timeline.